Galleria 3 Condos. Construction in Toronto
FOR INSTANT INFO CALL:
(416) 835 7800PROJECT DETAILS
- Project Name: Galleria 3 Condos
- Builders: Almadev
- Project Status: Construction
- Launch Date: 2024-07-03
- Address: 1185 Dupont Street, Toronto, Ontario, Canada, M6H 2A4
- City: Toronto
- Main Intersection: Dupont Street
- Area: Toronto
- Neighborhood: Junction Wallace Emerson
- Number Of Units: 429
- Location: Toronto
- Price: Request Pricing Information
Overview
Introducing Galleria III, the third chapter in the Galleria on the Park story. A design-forward condominium tower with 21,000 square feet of amenities geared to your well-being, Galleria III will be a new landmark at Dupont and Dufferin. In designing spaces for the residents of Galleria III, DesignAgency was inspired by the site’s history as a thriving centre of industry – and the singular vision of the architects from Hariri Pontarini. Delicate applications of utilitarian-style hard metal instill a contemporary, sophisticated effect.
Features
• Lobby Lounge • Parcel Storage • Mail Room • Co Working Spaces • Outdoor Yoga • Electric Car Charging Stations • Wine Cellar • Cabanas • Kids Zone • Outdoor Game Area • Yoga Studio • Private Dining • Outdoor Dining • Spa • Workshop • Chefs Kitchen • Meeting Room • Outdoor Terrace • Pet Wash Area • Meditation Room • Lounge Seating • Outdoor Swimming Pool • Bike Storage • 24 Hour Concierge Service • Fitness Room • Laundry Room • Storage Room • Dining Area • Payment Structure: Standard • $10000 on Signing • Balance to 5% in 30 Days • 5% in 365 Days

























